Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Mar 31, 2022     Smoke system; Oil temp wire bundle - (2 hours)       Category: Firewall Forward
1. Bundled and secured the wires from the oil temperature sensor.
2. Installed barb-to-NPT fittings on the ends of the smoke oil line connector that will allow me to remove the smoke system from the aft baggage compartment when I need to.
3. Installed the smoke oil distribution "T" that I assembled yesterday on the firewall.
4. Assembled the smoke nozzles, stainless lines and check valves so I could measure them in preparation for fabricating some more stainless lines to connect to the "T".



 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.